BARGAIN SECTION

Ex-Demo Offers
Latest Bargains
Special Offers

GO TO

Car Valeting
Global News
Industry Overview
Products
Quick Link

PRO RANGE STOCK ITEMS

60Hz Cold Pressure Wash
60Hz Hot Pressure Wash
60Hz Vacuums
Chemical Sprayers
Cold Water Pressure Washers
Commercial Vacuum Cleaners
Consumer
Engine Driven Pressure Wash
Hot Water Pressure Washers
Industrial Vacuums
Powered Sweepers
Scrubber Driers
Single Disc Rotary
Steam Generators
Systems XD

PRODUCTS & BUILT TO ORDER

Pressure washers
Vacuum cleaners
Carpet Cleaning
Scrubber dryers
Sweeping machines
Vapour steamers
Water recycling
Product Overview
Litter Collectors
Polishing Machines
Under Chassis Wash

TRAILER & SKID MOUNTED

Graffiti & Gum Removal
Mobile High Pressure
Past Projects & Examples
Special Build Sitemaster
Trailer & skid mounted

ULTRA HIGH PRESSURE

Electric & Engine Driven

VEHICLE WASH

Drive through systems

ABOUT US

Company Profile
Contact Us
ISO
Morclean News
Partner links
Price & Delivery
Testimonials

FIXED INSTALLATIONS

Heated Systems
Multi Pump Systems
Multipump Pro Centralized

INNOVATION

CleanGuide
Inflatables & Covers
Separators & Interceptors
Vacuum History
Vacuum Projects
Water Projects
Water Tanks

TECHNICAL & SUPPORT

Download Literature
Faq's & How To
ATEX Directive
Customer Service
Guidelines & Regs
Health & Safety
Instructions & Spec
Online COSHH & Data
Price Lists

SPEEDY RAMP

Buy a Ramp
Will it Fit?

TOOLS

Sitemap






Multi Lane Valeting & Wash Bays




Multi Lane Valeting & Wash Bays.
Morclean have designed and installed a range of Commercial Car Washes with Multi Lane Valeting and Wash Bay Systems. The system uses water via high pressure jet wash units to clean the cars.

The general specification listed below (based on a 3 lane car wash) will give you an idea of the systems available. Our technicians will be happy to advise further on your specific site and vehicle wash needs.

1. Silt trap situated in each lane ideally situated in between the first and second washing operation.

2. 1x 8000Ltr 3 Stage Interceptor.

3. For the first stage of washing we suggest hot foam lance on each lane, this would be achieved by a twin hot cabinet wash and one single cabinet with oil fired burner unit, giving independent use on each lane and quick release couplings.
Two twin cabinet washes to give spare capacity in case of breakdown or even longer life of wash by rotating.

4. For the second stage high pressure cold rinse off comprising of a 3 interpump pump (or 4 pump station to give some spare capacity) and motor spec. 1500Psi, 14Lpm, 240 volts, 3.5Hp motor complete with break water tank, and two minute time out which stops pump/motor if left not used for more than 2 minutes (stops motor burn out) with independent remote control per station.

5. We can install on/off remote controls on each lane where required, with shut off valves and quick release couplings to allow lances to be removed at night.

6. We may have to treat the water in the underground sump, with a cleansing agent. This would depend on what chemicals are to be used – foam alloy wheel cleaner, traffic film remover etc. Also any oils that may enter the sump.

System
A Reverse Osmosis system which comprises of air generation and iron removal. During the process we would soften the water and add pure salts to regenerate the water.

Flow rates & Tanks
The system would operate at a flow rate of 1 cubic metre per hour. This would require a 16 cubic metre, 3.8 x 2.5m below ground storage tank to maintain the flow to the pressure washers. Based on a system to treat a maximum of 20 cubic metres per day. Our understanding of regulations are that you are permitted to remove up to 20 cubic metres per day before requiring a licence.

Installation & delivery
The system would require a booster pump to feed the pressure washers after treatment and 6 feed pipes to each, as well as connections to the provided power and town water in the event of top up. As we are discharging approx 25% of water per day this will need to be directed to mains foul drain via a pipe or duct etc.

Footprint and dims
The anticipated maximum dimension of the unit would be 3.2m and we need to ensure this can be accommodated in the plant room.

Terms & delivery
The delivery period from the date of a confirmed and written order is 6 to 8 weeks.


Latest News
 

Newsletter
Please enter your email address below to receive our newsletter emails


All content Copyright © Morclean Ltd 2010